What to Expect When Building a Pool in Gainesville, FL: A Timeline Guide
- toribates21
- Jun 23
- 3 min read
Last updated: June 2026
One of the most common questions homeowners have before signing a pool contract isn't about price - it's "what is actually going to happen in my backyard, and for how long?" Here's a real, phase-by-phase look at what a Pools & More build looks like from permit to swim-ready.
How Long Does It Take, Generally?
Gunite (concrete) pool construction in Florida generally takes several months from permit approval to swim-ready, accounting for concrete curing time, weather, and inspection scheduling. Exact timelines depend on your specific project and permitting jurisdiction - you'll get a realistic timeline for your yard during your design consultation, not a generic number.
The 9 Phases of a Pools & More Build
Permit Approval & Preparation - We handle all permits and approvals required by local regulations, then complete site planning, layout marking, and utility checks to prepare the foundation.
Excavation & Digging - We excavate the backyard using professional equipment, assess soil conditions, and make necessary grading adjustments to create a stable foundation.
Steel Reinforcement - A steel rebar framework is installed to reinforce the pool structure, ensuring durability, stability, and resistance against ground movement.
Shell Application - Using a high-pressure shotcrete process, we apply a durable concrete mixture over the steel framework, then allow it to cure for several days.
Backfill, Plumbing & Tile Installation - We adjust the ground for drainage, install high-quality pipes, drains, skimmers, and return lines, then apply waterproofing and custom tile.
Decking & Footer Installation - The pool deck is constructed using materials like concrete or pavers, and pool coping plus footers are installed for structural support.
Equipment Installation - All essential equipment - pumps, filters, heaters, saltwater systems, and automation controls - is installed and tested for proper operation.
Plaster & Final Touches - The pool interior receives a smooth, watertight finish, then the pool is filled with water and chemicals are balanced for safe swimming.
Pool Safety - We conduct a thorough safety inspection to ensure compliance with local safety regulations, followed by operational training for the homeowner.
What Disruption Should You Expect?
Construction involves heavy equipment access to your backyard during excavation (Phase 2), several days of concrete curing time after the shotcrete shell is applied (Phase 4), and standard noise and activity during active build phases. We walk you through what to expect at each of the 9 phases before work begins, so nothing is a surprise once equipment shows up.
After Construction: Training & Maintenance
Once your pool passes its final safety inspection (Phase 9), you get hands-on training covering water chemistry balancing, equipment operation (pumps, filters, and saltwater systems if installed), and a basic maintenance schedule - so you're not left guessing how to take care of a brand-new pool.
Ready to see a timeline for your specific yard? Request a free design consultation and we'll start with a 3D design before any construction commitment.

Related Questions
How long does it take to build a pool?
Generally, gunite pool construction in Florida takes several months from permit approval to swim-ready, accounting for curing time, weather, and inspection scheduling. You'll get a project-specific timeline during your consultation.
What happens during the excavation phase?
We excavate the backyard with professional equipment, assess soil conditions, and make any grading adjustments needed to create a stable foundation - Phase 2 of our 9-step process, right after permitting.
Do I need a permit to build a pool in Florida?
Yes. Pool construction requires local permits covering structural, electrical, and safety-barrier requirements. Pools & More handles all permit approvals as Phase 1 of the build process.